Project details

Anglian Water PLC - Kings Lynn WwTW

CustomerGMT JV
LocationKings Lynn, United Kingdom
Project executed on2009
Market segmentWater & Wastewater
Technical specification
PressureNA
MeasurementsNA
MediumNA
MaterialNA
TemperatureNA

Project description

Complete turnkey Odour Control Plants (2 No.) including:

  • Bio-Airclean Biofilter
  • Carbon Adsorber Unit
  • GRP Stack
  • OCU and Field Ductwork Systems
  • Secondary and Intermediate Steelwork
  • Control Systems
  • Proprietary Equipment (Fans, Pumps, Pipework, Valves & Instrumentation etc.)
  • Pipework Systems
  • Installation
  • Testing and Commissioning

TOTAL CONTRACT VALUE: Circa £300,000

  • Airflow: 5125 Am3/hr
  • H2S levels: 460 (peak) 132 (average)
  • Performance: 98% removal (<30,000 OUE/s)

GMT JV – Kings Lynn – ‘ This project was a number of biogas process plants being installed by Anglian Water and  GMT JV, a consortium company Galliford Try & Imtech,  issued a specification document compiled by their consultants (Imtech/Anglian Water  involvement) with suggested and preferred odour abatement  technology from which Plasticon UK designed, manufactured and installed  the odour abatement system’.