
Project map
Projects
MVA Karlsruhe
MVA Karlsruhe, Karlsruhe, Waste incineration,
Plasticon Composites supplied a full package of process equipment and storage tanks at a large waste incineration plant in Germany. The package included two special engineered horizontal gaswashers made of PP-GRP material which are of exceptional design.
» Read more
MVA Cologne
MVA Cologne, Köln, Waste incineration,
Plasticon Composites supplied a waste incineration plant in Germany with four gaswashers (HCl), four SO2 gaswashers, duct systems, storage tanks and pressure vessels.
» Read more
Extension of lifetime of the waste-to-energy plant of Ivry-sur-Seine
LAB for Syctom ( waste management syndicate for Paris), Ivry sur Seine, Paris (F-94), Waste incineration,
Plasticon Composites and LAB answered the public tender for the extension of the lifetime of the waste-to-energy plant of Ivry-sur-Seine (Paris, France) as consortium. LAB, the representative of the consortium, is an European Leader in designing and building turnkey Flue Gas Treatment plants.
» Read more
Gas Ducts Waste incineration plant, GAVI Wijster
Lurgi Germany GmbH, Wijster, Waste incineration,
Plasticon Composites was responsible for the design, engineering, production and assembling of large diameter gas ducts for Lurgi German GmbH (EPC Contractor). The duct system consist out of three lines and will be used for the transport of clean vent gas from the scrubbers to the stack.
» Read more
Scrubbers for waste incineration plant
AE&E, Botlek, Rotterdam, the Netherlands, Waste incineration,
Plasticon Composites did the complete engineering and supply of in total 12 scrubbers for the waste incineration plant of Afval Verbranding Rijnmond (AVR). The scrubbers are used for removal of acid and alkaline parts out of the vapours during the burning process.
» Read more